MAKLUMAT LANJUT LOT BUMIPUTERA


BIL NO LOT JENIS RUMAH JENIS PROJEK KELUASAN TANAH (Kp) KELUASAN LANTAI (Mp) KEDUDUKAN LOT HARGA
1 PTD 193144 INDUSTRI TERES 1 1/2 TINGKAT LOT BUMIPUTERA 8,045.79 747.48 TENGAH RM 2,544,217.03
2 PTD 193145 INDUSTRI TERES 1 1/2 TINGKAT LOT BUMIPUTERA 15,856.90 747.48 TENGAH RM 2,544,217.03
3 PTD 193146 INDUSTRI TERES 1 1/2 TINGKAT LOT BUMIPUTERA 8,045.79 747.48 TENGAH RM 2,544,217.03
4 PTD 193147 INDUSTRI TERES 1 1/2 TINGKAT LOT BUMIPUTERA 15,856.90 718.39 TENGAH RM 2,240,386.23